regular meeting with faculty members from the university's formations
President of the Northern Technical University Holds Periodic Meeting with Faculty Members at Nineveh Campus. 
2025-07-08
the Facility Protection Unit (FPS) building after its rehabilitation.
President of the Northern Technical University Inaugurates the Newly Renovated Facility for Facility Protection (FPS).
2025-07-08
regular meeting with faculty members from the university's formations
President of the Northern Technical University Holds Periodic Meeting with Faculty Members at Nineveh Campus. 
2025-07-08
the Facility Protection Unit (FPS) building after its rehabilitation.
President of the Northern Technical University Inaugurates the Newly Renovated Facility for Facility Protection (FPS).
2025-07-08
Show all

President of the Northern Technical University Inspects Renovation Progress at the Dean’s Building of the Mosul Technical Engineering College. 

the rehabilitation stages of the Deanship of the Technical Engineering College Mosul.

President of the Northern Technical University Inspects Renovation Progress at the Dean’s Building of the Mosul Technical Engineering College.

Prof. Dr. Alia Abbas Ali Al-Attar, President of the Northern Technical University, conducted an inspection visit to review the ongoing renovation work at the Dean’s Building of the Mosul Technical Engineering College. This visit comes as part of the university’s continuous efforts to enhance its infrastructure and improve the educational and administrative environment across its colleges.
During her field tour, the University President was briefed on the progress of the rehabilitation project, emphasizing the importance of adhering to technical specifications and academic standards during implementation, as well as the necessity of completing the project within the designated timeframe. She also stressed the need to create an environment that supports both academic and administrative staff, and enhances the quality of services provided to students.
Dr. Al-Attar praised the efforts of the engineering and technical teams working on the project, commending their dedication and commitment to delivering high-quality results despite existing challenges.
This visit is part of the university’s broader plan to upgrade its infrastructure in line with its vision of achieving performance excellence and providing a fully integrated academic environment.

Comments are closed.